Go To Search
HomePrint
RSSEmail

Groundwater Management Plan
General
The City completed the Gloria Way Water Well Production Alternatives Analysis and Water Security Feasibility Study in November 2012, which recommended that the City to:  (i) move forward with design of a manganese removal treatment system for the existing Gloria Way Well; (ii) further evaluate and test for additional potential well sites; and (iii) develop a groundwater management and monitoring plan.  

The City intends to reactivate Gloria Way Well upon construction of a well head treatment facility to address removal of manganese, a secondary drinking water contaminant.  As part of the reactivation process, State law requires the City to adopt a Groundwater Management Plan.  The development of the Groundwater Management Plan is a collaborative and open process.  A copy of the Stakeholder Outreach Plan can be found in the link below: